St. Vincent’s Academy

The more than $3 million historic renovation project which began in the Summer of 2020, added an additional 11,000-plus SF to the school, allowing for six additional classrooms, assembly space, a board room, a museum room, offices, and small meeting spaces. A new elevator and stair tower were constructed to reach the third-floor area from the ground floor. Aside from interior structural renovations, construction also provided the necessary technical advancements and digital infrastructure warranted in today’s modern academic settings.

Architect
Lominack Koleman Smith
Gross area
11,000 SF
Date
Fall 2021
Cost
$3.1M